PR-52 over MONTEHIEDRA AVE
PR-18 HM 4.1 · County 127, Puerto Rico · Built 2020 · 2 Lanes · 120,300 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
18.343642, -66.069022
This bridge is in worse condition than 10% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 6 years old.
Nearby Bridges
PR 52 NOBD 4.1 KM over MONTEHIEDRA AVENUE
Built 1977
PR 52 over PIEDRAS RIVER
Built 1977
PR 52 SOBD 4.1 KM over MONTEHIEDRA AVENUE
Built 1977
RAMP TO PR 52 over PIEDRAS RIVER
Built 1992
CAMINO LOS ROMEROS over RIO PIEDRAS CREEK
Built 1980
PR 52 SOUTHBOUND over PEDRO VIARA ROAD
Built 1977
PR 52 NORTHBOUND over LOCAL ROAD
Built 1977
PR-52 over CALLE TULIP
Built 2020
PR 52 NOBD 7.3 KM over LOCAL ROAD
Built 1977
PR-52 over CAMINO LUCIANO VAZQUEZ
Built 2020
Bridge Details
- Structure #
- 030981
- Year Built
- 2020
- Length
- 76.2 m (250 ft)
- Max Span
- 36.2 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 120,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.