PR 52 SOBD 4.1 KM over MONTEHIEDRA AVENUE
10 KM S W OF RIO PIEDRAS · County 127, Puerto Rico · Built 1977 · 5 Lanes · 60,150 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.344436, -66.068558
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 49 years old.
Nearby Bridges
RAMP TO PR 52 over PIEDRAS RIVER
Built 1992
PR 52 NOBD 4.1 KM over MONTEHIEDRA AVENUE
Built 1977
PR 52 over PIEDRAS RIVER
Built 1977
PR-52 over MONTEHIEDRA AVE
Built 2020
CAMINO LOS ROMEROS over RIO PIEDRAS CREEK
Built 1980
PR-52 over CALLE TULIP
Built 2020
PR 52 SOUTHBOUND over PEDRO VIARA ROAD
Built 1977
PR 52 NORTHBOUND over LOCAL ROAD
Built 1977
OFF PR 176 7.5 KM over PIEDRAS RIVER
Built 1972
PR 52 NOBD 7.3 KM over LOCAL ROAD
Built 1977
Bridge Details
- Structure #
- 012632
- Year Built
- 1977
- Length
- 75.8 m (248.7 ft)
- Max Span
- 36 m
- Width
- 28.4 m (93.2 ft)
- Lanes
- 5
- Daily Traffic
- 60,150
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.