PR 66 over PR 3

3KM AT NW OF CAROLIN A · County 031, Puerto Rico · Built 2007 · 7 Lanes · 41,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
028122
Year Built
2007
Length
45.8 m (150.3 ft)
Max Span
45.8 m
Width
51.3 m (168.3 ft)
Lanes
7
Daily Traffic
41,300
Material
Prestressed Concrete
Design
Girder and Floorbeam System
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.