PR 3 8.9 KM over BLASINA CREEK

1.5 KM N W OF CAROLINA · County 031, Puerto Rico · Built 1953 · 8 Lanes · 45,200 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
006591
Year Built
1953
Reconstructed
1985
Length
10.3 m (33.8 ft)
Max Span
6 m
Width
33 m (108.3 ft)
Lanes
8
Daily Traffic
45,200
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.