Local Road over Chiclana Creek

4 kms east of Guaynabo · County 127, Puerto Rico · Built 2005 · 4 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
027651
Year Built
2005
Length
86.7 m (284.4 ft)
Max Span
28.9 m
Width
19.6 m (64.3 ft)
Lanes
4
Daily Traffic
150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.