PR 916 3.5 KM over QUEBRADA GRANDE CREEK

2.5 KM. S. OF SAN LORENZO · County 129, Puerto Rico · Built 2003 · 2 Lanes · 9,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
027051
Year Built
2003
Length
54.7 m (179.5 ft)
Max Span
27.5 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
9,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$95,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.