PR 181 over SALVA TIERRA CREEK

4 KM SOUTH OF SAN LORENZO · County 129, Puerto Rico · Built 1927 · 2 Lanes · 2,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
004221
Year Built
1927
Length
10.9 m (35.8 ft)
Max Span
9.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
2,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$155,000
Total Project Cost
$233,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.