PR 22 EASTBOUND over PR 674 & INDIO RIVER

1.5 KM S E OF VEGA BAJA · County 145, Puerto Rico · Built 1995 · 2 Lanes · 70,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
023542
Year Built
1995
Length
521.9 m (1712.3 ft)
Max Span
36.5 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
70,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$787,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.