PR 22 EASTBOUND over DEPRESION

2.5 KM S.E. VEGA BAJA · County 145, Puerto Rico · Built 1995 · 2 Lanes · 35,050 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
023472
Year Built
1995
Length
877.4 m (2878.6 ft)
Max Span
38.8 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
35,050
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$3,132,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.