PR 22 EASTBOUND over GRANDE DE ARECIBO RIVER

2 KM SOUTHEAST OF ARECIBO · County 013, Puerto Rico · Built 1974 · 2 Lanes · 15,350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
020582
Year Built
1974
Length
1500 m (4921.3 ft)
Max Span
42.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
15,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$4,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.