PR 22 WESTBOUND over PR 638

6 KM SOUTHEAST OF ARECIBO · County 013, Puerto Rico · Built 1973 · 2 Lanes · 23,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014482
Year Built
1973
Length
29.4 m (96.5 ft)
Max Span
28 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
23,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$109,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.