PR 52 SOUTHBOUND over SANTO DOMINGO CREEK ROAD

1.5 KM SOUTH OF CAYEY · County 035, Puerto Rico · Built 1974 · 2 Lanes · 16,450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020552
Year Built
1974
Length
184.4 m (605 ft)
Max Span
25.6 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
16,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$3,666,000
Total Project Cost
$4,582,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.