PR 15 over WATERWAY

AT CAYEY TOWN · County 035, Puerto Rico · Built 1900 · 2 Lanes · 12,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
019861
Year Built
1900
Reconstructed
1967
Length
20 m (65.6 ft)
Max Span
6 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
12,800
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$472,000
Total Project Cost
$566,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.