PR 2 197.85 KM over PR 128
1.4 KM SOUTHEAST OF YAUCO · County 153, Puerto Rico · Built 1972 · 4 Lanes · 19,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
18.0253, -66.853917
This bridge is in worse condition than 58.5% of bridges in County 153. The average bridge in Puerto Rico is 0 years old; this one is 54 years old.
Nearby Bridges
PR 2 198.6 KM over DIRT ROAD
Built 1972
PR 2 over BERRENCHIN CREEK
Built 1998
PR-2 over YAUCO RIVER & PR-335
Built 2003
PR 127 over YAUCO RIVER
Built 1992
PR 368 13.5 KM over BERRENCHIN CREEK
Built 1953
PR 359 over PR 2
Built 2023
LOCAL ROAD over PR 2
Built 1976
PR 368 12.20 KM over SUSUA CREEK
Built 1960
PR 376 0.5 KM over BARRANCHIN CREEK
Built 1988
PR 121 13.2 KM over CREEK
Built 2006
Bridge Details
- Structure #
- 020321
- Year Built
- 1972
- Length
- 35.3 m (115.8 ft)
- Max Span
- 34 m
- Width
- 29.1 m (95.5 ft)
- Lanes
- 4
- Daily Traffic
- 19,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $262,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.