PR 376 0.5 KM over BARRANCHIN CREEK

0.5 KM.NORTHWEST OF YAUCO · County 153, Puerto Rico · Built 1988 · 2 Lanes · 4,100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
026201
Year Built
1988
Length
9.5 m (31.2 ft)
Max Span
4.6 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
4,100
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$16,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.