PR 139 1.7 KM over BAYAGAN RIVER
1.6 KM NORTH OF PR 14 · County 113, Puerto Rico · Built 1987 · 2 Lanes · 2,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.045583, -66.586214
This bridge is in worse condition than 27.4% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 39 years old.
Nearby Bridges
PR 139 1.7 KM over WATERWAY
Built 2010
LA COROSA ST .1 KM over WATERWAY CHANNEL
Built 1997
SERRALLES STREET over PR 10
Built 1997
OFF PR 139 2.2 KM over AUSUBO CREEK
Built 1976
OFF PR 14 5.5 KM over INABON RIVER
Built 1978
PR 14 5.4 KM over BUCANA RIVER
Built 1976
PR-10 KM 4.55 over PR-14 KM 4.10
Built 2003
PR 14 over DITCH
Built 2006
PR 997 7.8 KM over LA MINA CREEK
Built 1981
PR 10 KM 3.8 over RIO BUCANA
Built 1997
Bridge Details
- Structure #
- 018591
- Year Built
- 1987
- Length
- 138.7 m (455.1 ft)
- Max Span
- 23.1 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,002,000
- Total Project Cost
- $5,630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.