PR 14 5.4 KM over BUCANA RIVER
AT PONCE ENTRANCE IN PR14 · County 113, Puerto Rico · Built 1976 · 3 Lanes · 36,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.039397, -66.582594
This bridge is in worse condition than 61.3% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 50 years old.
Nearby Bridges
OFF PR 14 5.5 KM over INABON RIVER
Built 1978
SERRALLES STREET over PR 10
Built 1997
LA COROSA ST .1 KM over WATERWAY CHANNEL
Built 1997
PR 10 KM 3.8 over RIO BUCANA
Built 1997
RAMP PR10 TO PR14 over BUCANA RIVER
Built 1997
PR-10 KM 4.55 over PR-14 KM 4.10
Built 2003
PR 139 1.7 KM over BAYAGAN RIVER
Built 1987
PR 14 over DITCH
Built 2006
PR 139 1.7 KM over WATERWAY
Built 2010
OFF PR 139 2.2 KM over AUSUBO CREEK
Built 1976
Bridge Details
- Structure #
- 014331
- Year Built
- 1976
- Length
- 89.1 m (292.3 ft)
- Max Span
- 24.6 m
- Width
- 18.3 m (60 ft)
- Lanes
- 3
- Daily Traffic
- 36,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,338,000
- Total Project Cost
- $3,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.