PR 14 5.4 KM over BUCANA RIVER

AT PONCE ENTRANCE IN PR14 · County 113, Puerto Rico · Built 1976 · 3 Lanes · 36,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
014331
Year Built
1976
Length
89.1 m (292.3 ft)
Max Span
24.6 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
36,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,338,000
Total Project Cost
$3,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.