PERIFER ST. 0.3 KM over PR 20 MRTNZ NADAL EXP

400 MTS FROM INT OLD PR20 · County 061, Puerto Rico · Built 1986 · 2 Lanes · 37,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018491
Year Built
1986
Length
101.2 m (332 ft)
Max Span
39.8 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
37,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,182,000
Total Project Cost
$2,727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.