PR 169 0.50 KM over CAMARONES CREEK
3 KM S E OF GUAYNABO · County 061, Puerto Rico · Built 1921 · 2 Lanes · 16,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.344419, -66.107422
This bridge is in worse condition than 60.3% of bridges in County 061. The average bridge in Puerto Rico is 0 years old; this one is 105 years old.
Nearby Bridges
PR 20 over LOCAL ROAD
Built 2000
PR-20 over LOCAL ROAD
Built 2000
PERIFER ST. 0.3 KM over PR 20 MRTNZ NADAL EXP
Built 1986
ALPIERRE ST 0.8 KM over GUAYNABO RIVER
Built 1950
PR 836 1.1 KM over CAMARONES CREEK
Built 1961
SAN IGNACIO 0.5 KM over PR 20 6.05 KM
Built 1986
PR 836 0.1 KM over GUAYNABO RIVER
Built 1954
PR 169 over FRAILES CREEK
Built 1992
PR 837 over GUAYNABO RIVER
Built 1977
SAN ANTO ST .10 KM over GUAYNABO RIVER
Built 1983
Bridge Details
- Structure #
- 001821
- Year Built
- 1921
- Reconstructed
- 1960
- Length
- 6.6 m (21.7 ft)
- Max Span
- 6.1 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 16,200
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $27,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.