PR 396 over CAIN RIVER
4 KM NORTH OF SAN GERMAN · County 125, Puerto Rico · Built 1980 · 2 Lanes · 100 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.106222, -67.033872
This bridge is in worse condition than 61.7% of bridges in County 125. The average bridge in Puerto Rico is 0 years old; this one is 46 years old.
Nearby Bridges
OFF PR 361 AT 4.2 over CAIN RIVER
Built 1993
PR 2 173.6 KM over CAIN RIVER
Built 1964
PR 2 over TORUNO CREEK
Built 1964
PR 2 174.1 KM over HOSP CONCEPSION ACCESS
Built 2010
PR 119 over PR 2
Built 2010
PR 2 175.1 KM over PR 122 0.2 KM
Built 2014
OFF PR 361 AT 4.4 over CAIN RIVER
Built 2000
PR 119 75.7 KM over HOCONUCO RIVER
Built 1927
PR 360 over GUANAJIBO RIVER
Built 1978
PR-122 over GUANAJIBO RIVER
Built 2014
Bridge Details
- Structure #
- 017291
- Year Built
- 1980
- Length
- 51.1 m (167.7 ft)
- Max Span
- 24.7 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $837,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.