PR 2 over TORUNO CREEK

1.5 KM NORTH SAN GERMAN · County 125, Puerto Rico · Built 1964 · 4 Lanes · 38,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
007931
Year Built
1964
Reconstructed
2003
Length
67.1 m (220.1 ft)
Max Span
4.3 m
Width
24.9 m (81.7 ft)
Lanes
4
Daily Traffic
38,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$720,000
Total Project Cost
$864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.