PR 22 over PR 165

0.2 KM N INT PR165 & · County 137, Puerto Rico · Built 1980 · 7 Lanes · 89,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017191
Year Built
1980
Length
46.1 m (151.2 ft)
Max Span
23.2 m
Width
44.3 m (145.3 ft)
Lanes
7
Daily Traffic
89,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.