PR 693 0.1 KM over NUEVO RIVER
0.4 KM OF INT PR2 & P · County 051, Puerto Rico · Built 1925 · 2 Lanes · 13,400 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
18.410756, -66.263983
This bridge is in worse condition than 55% of bridges in County 051. The average bridge in Puerto Rico is 0 years old; this one is 101 years old.
Nearby Bridges
PR 693 0.5 KM over NUEVO RIVER
Built 1982
PR 165 13.7 KM over PR 2 22.0 KM
Built 1981
PR 2 23 KM over LA PLATA RIVER
Built 1944
PR 2 23.4 KM over LA PLATA RIVER
Built 1944
PR 22 EASTBOUND over LA PLATA RIVER & PR
Built 1990
PR 22 22.7 KM over LA PLATA RIVER & PR
Built 1985
PR 22 over PR 165
Built 1980
PR 865R 0.1 KM over PR 22 19.5 KM
Built 1981
PR 932 0.3 KM over PR 203 2.5 KM
Built 1997
PR-693 over DRAINAGE CHANNEL
Built 1988
Bridge Details
- Structure #
- 005171
- Year Built
- 1925
- Length
- 11.8 m (38.7 ft)
- Max Span
- 8.7 m
- Lanes
- 2
- Daily Traffic
- 13,400
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $307,000
- Total Project Cost
- $461,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.