PR 183 over TURABO RIVER

0.5 KM EAST OF CAGUAS · County 025, Puerto Rico · Built 1973 · 2 Lanes · 23,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014591
Year Built
1973
Length
83.5 m (274 ft)
Max Span
27.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
23,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,475,000
Total Project Cost
$2,970,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.