PR 52 over PR 156

1 KM WEST OF CAGUAS · County 025, Puerto Rico · Built 1964 · 7 Lanes · 93,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
008611
Year Built
1964
Reconstructed
1993
Length
34.5 m (113.2 ft)
Max Span
17.4 m
Width
32.4 m (106.3 ft)
Lanes
7
Daily Traffic
93,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.