PR 111 18.5 KM over GUATEMALA RIVER

1 KM N W OF SAN SEBASTIAN · County 131, Puerto Rico · Built 1978 · 2 Lanes · 19,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014271
Year Built
1978
Length
36.6 m (120.1 ft)
Max Span
35.9 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
19,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$57,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.