PR 125 17.85 KM over GUATEMALA RIVER

2 KM N W OF SAN SEBASTIAN · County 131, Puerto Rico · Built 1917 · 2 Lanes · 14,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
002331
Year Built
1917
Length
7.8 m (25.6 ft)
Max Span
6.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
14,200
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.