M LOS ANGLS KM 0.1 over SUAREZ CHANNEL
OFF PR 26 AT KM 11.0 · County 031, Puerto Rico · Built 1960 · 3 Lanes · 24,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
18.431806, -65.986536
This bridge is in worse condition than 89.3% of bridges in County 031. The average bridge in Puerto Rico is 0 years old; this one is 66 years old.
Nearby Bridges
PR 190 KM 0.1 over SUAREZ CHANNEL
Built 1974
PR 26 11 KM over PR 190 0.1 KM
Built 1965
PR 26 EABD 11 KM over SUAREZ CHANNEL & PR
Built 1965
ITURREGUI AVENUE over ITURREGUI CHANNEL
Built 1958
CAMPO RICO AVENUE over PR 26 13.1 KM
Built 1965
CAMPO RICO AVENUE over CREEK
Built 1960
CMP RIC AVE KM 2.8 over CREEK
Built 1960
SOL ST 0.30 KM over CHANNEL
Built 1981
Aeropuerto Ave 0.8 over Aeropuerto Ave 0.8
Built 2000
ITURREGUI AVENUE over SAN JOSE LAGOON CHANNEL
Built 1965
Bridge Details
- Structure #
- 013441
- Year Built
- 1960
- Length
- 18.3 m (60 ft)
- Max Span
- 8.8 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 3
- Daily Traffic
- 24,800
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.