PR 26 EABD 11 KM over SUAREZ CHANNEL & PR
6.5 KM N W OF CAROLINA · County 031, Puerto Rico · Built 1965 · 3 Lanes · 50,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.427933, -65.989931
This bridge is in worse condition than 62.7% of bridges in County 031. The average bridge in Puerto Rico is 0 years old; this one is 61 years old.
Nearby Bridges
PR 26 11 KM over PR 190 0.1 KM
Built 1965
M LOS ANGLS KM 0.1 over SUAREZ CHANNEL
Built 1960
PR 190 KM 0.1 over SUAREZ CHANNEL
Built 1974
ITURREGUI AVENUE over ITURREGUI CHANNEL
Built 1958
CAMPO RICO AVENUE over PR 26 13.1 KM
Built 1965
CAMPO RICO AVENUE over CREEK
Built 1960
SOL ST 0.30 KM over CHANNEL
Built 1981
ITURREGUI AVENUE over SAN JOSE LAGOON CHANNEL
Built 1965
CMP RIC AVE KM 2.8 over CREEK
Built 1960
Aeropuerto Ave 0.8 over Aeropuerto Ave 0.8
Built 2000
Bridge Details
- Structure #
- 009972
- Year Built
- 1965
- Length
- 81.9 m (268.7 ft)
- Max Span
- 31.6 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 3
- Daily Traffic
- 50,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $398,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.