PR 52 SOUTHBOUND over RURAL LOCAL ROAD

2 KM NORTHEAST OF SALINAS · County 123, Puerto Rico · Built 1972 · 2 Lanes · 17,040 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012352
Year Built
1972
Length
31.2 m (102.4 ft)
Max Span
30 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
17,040
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.