PR 52 NORTHBOUND over PR 1

0.5 KM NORTH OF SALINAS · County 123, Puerto Rico · Built 1972 · 2 Lanes · 37,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
012322
Year Built
1972
Length
58.8 m (192.9 ft)
Max Span
28.2 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
37,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.