PR 52 86.2 KM over CA¥AS RIVER
6 KM S E OF JUANA DIAZ · County 075, Puerto Rico · Built 1970 · 2 Lanes · 17,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.033506, -66.466022
This bridge is in worse condition than 15.8% of bridges in County 075. The average bridge in Puerto Rico is 0 years old; this one is 56 years old.
Nearby Bridges
PR 52 NOBD 86.2 KM over CAÑAS RIVER
Built 1970
PR 52 NOBD 86.3 KM over PR 535 4.8 KM
Built 1970
PR 52 SOUTHBOUND over PR 535
Built 1970
OFF PR 535 3.4 KM over CANAS RIVER
Built 1985
PR 535 4.5 KM over CAIMITO RIVER
Built 1948
PR 52 NOBD 87.8 KM over IRRIGATION CHANNEL
Built 1970
PR 52 SOUTHBOUND over IRRIGATION CHANNEL
Built 1970
PR 52 NOBD 88.1 KM over DIRT ROAD
Built 1971
PR 52 SOUTHBOUND over DIRT ROAD
Built 1971
PR 52 NOBD 89.1 KM over DIRT ROAD
Built 1970
Bridge Details
- Structure #
- 012072
- Year Built
- 1970
- Length
- 118 m (387.1 ft)
- Max Span
- 29.8 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 17,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $335,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.