PR 52 SOUTHBOUND over DIRT ROAD
5 KM EAST OF JUANA DIAZ · County 075, Puerto Rico · Built 1971 · 2 Lanes · 17,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.030811, -66.481961
This bridge is in worse condition than 40.4% of bridges in County 075. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 52 SOUTHBOUND over IRRIGATION CHANNEL
Built 1970
PR 52 NOBD 88.1 KM over DIRT ROAD
Built 1971
PR 52 NOBD 87.8 KM over IRRIGATION CHANNEL
Built 1970
PR 52 NOBD 89.1 KM over DIRT ROAD
Built 1970
PR 52 SOUTHBOUND over DIRT ROAD
Built 1970
600M OFF PR 510 over UNNAMED STREAM
Built 2000
OFF PR 535 3.4 KM over CANAS RIVER
Built 1985
PR 52 NOBD 86.3 KM over PR 535 4.8 KM
Built 1970
PR 52 SOUTHBOUND over PR 535
Built 1970
PR 52 86.2 KM over CA¥AS RIVER
Built 1970
Bridge Details
- Structure #
- 011532
- Year Built
- 1971
- Length
- 31.2 m (102.4 ft)
- Max Span
- 29 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 17,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $714,000
- Total Project Cost
- $857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.