OFF PR 200 0.7 KM over CREEK
APOLONIA GTNGS 0.01 KM · County 147, Puerto Rico · Built 1930 · 1 Lanes · 10,300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
2
Critical
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 2 | Critical |
| Substructure | 5 | Fair |
Location
18.120753, -65.433039
This bridge is in worse condition than 92.9% of bridges in County 147. The average bridge in Puerto Rico is 0 years old; this one is 96 years old.
Nearby Bridges
Route 10 over Unnamed Drainage
Built 2009
PR 200R KM 0.30 over COFRESI CREEK
Built 1940
PR 200R 0.7 KM over WATERWAY
Built 1930
PR 996 1.2 KM over LA MINA CREEK
Built 1961
OFF PR 997 3.20 KM over UNNAMED CREEK
Built 2014
RTE. 010 over LA CHIVA LAGOON
Built 2012
Rt 109 over UNNAMED DRAINAGE
Built 2009
MUNICIPAL WAY over WATERWAY
Built 2022
PR 994 1.3 KM over KIANI LAGOON
Built 2010
Rte. 020 over Kiani Lagoon
Built 2010
Bridge Details
- Structure #
- 011331
- Year Built
- 1930
- Length
- 14 m (45.9 ft)
- Max Span
- 6.2 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 10,300
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.