PR 996 1.2 KM over LA MINA CREEK
6 KM S W OF ISABEL II · County 147, Puerto Rico · Built 1961 · 2 Lanes · 3,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.107183, -65.469508
This bridge is in worse condition than 57.1% of bridges in County 147. The average bridge in Puerto Rico is 0 years old; this one is 65 years old.
Nearby Bridges
OFF PR 200 0.7 KM over CREEK
Built 1930
Route 10 over Unnamed Drainage
Built 2009
Rt 109 over UNNAMED DRAINAGE
Built 2009
MUNICIPAL WAY over WATERWAY
Built 2022
PR 200R KM 0.30 over COFRESI CREEK
Built 1940
PR 200R 0.7 KM over WATERWAY
Built 1930
OFF PR 997 3.20 KM over UNNAMED CREEK
Built 2014
RTE. 010 over LA CHIVA LAGOON
Built 2012
PR 994 1.3 KM over KIANI LAGOON
Built 2010
Rte. 020 over Kiani Lagoon
Built 2010
Bridge Details
- Structure #
- 007891
- Year Built
- 1961
- Reconstructed
- 1965
- Length
- 19.4 m (63.6 ft)
- Max Span
- 9.9 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 3,100
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $248,000
- Total Project Cost
- $371,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.