PR 328 5.7 KM over IRRIGATION CHANNEL
4 KM S W OF SABANA GRANDE · County 121, Puerto Rico · Built 1960 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.048094, -66.981206
This bridge is in worse condition than 25.9% of bridges in County 121. The average bridge in Puerto Rico is 0 years old; this one is 66 years old.
Nearby Bridges
PR 329 over RAILROAD TRACK
Built 1940
PR 2 over LOCAL ROAD
Built 1974
PR 102 PR 329 2 KM over Rio Guanajibo
Built 2005
PR 329 over PANCHOLO CREEK
Built 1940
RAMP PR2 TO PR117 over IRRIGATION CHANNEL
Built 1979
PR 2 183.5 KM over PR 328 0.03 KM
Built 1974
PR 2 over PR 117 & WATERWAY
Built 1974
RAMP PR117 TO PR2 over IRRIGATION CHANNEL
Built 1979
PR 121 1.2 KM over GUANAJIBO RIVER
Built 1978
CONNECTOR TO PR121 over PR 2
Built 1972
Bridge Details
- Structure #
- 011101
- Year Built
- 1960
- Length
- 10 m (32.8 ft)
- Max Span
- 9.2 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $27,000
- Total Project Cost
- $39,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.