CONNECTOR TO PR121 over PR 2

1 KM SOUTH SABANA GRANDE · County 121, Puerto Rico · Built 1972 · 4 Lanes · 21,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
012491
Year Built
1972
Length
45.8 m (150.3 ft)
Max Span
22.9 m
Width
24.1 m (79.1 ft)
Lanes
4
Daily Traffic
21,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.