PR 18 1.00 KM over PR 23 2.50 KM
AT INT PR 18 AND PR 23 · County 127, Puerto Rico · Built 1967 · 12 Lanes · 183,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.419922, -66.070814
This bridge is in worse condition than 99% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 59 years old.
Nearby Bridges
RAMP PR18 TO PR22 over PR 22
Built 1975
Local Road over Chardon Avenue
Built 2006
PR 18 0.65 KM over CHARDON STREET
Built 1972
RAMP CHAR TO SJU over CALLE KALAF
Built 2006
PR 18 over KALAF STREET
Built 1972
PR 18 over DOMENECH STREET
Built 1967
PR 23 KM 2.3 over PIEDRAS RIVER
Built 1951
PR 23 WESTBOUND over PIEDRAS RIVER
Built 1950
RAMP PR18 TO PR22 over PR 18
Built 1975
RAMP PR 22 - PR 18 over LOS MUERTOS CREEK
Built 1975
Bridge Details
- Structure #
- 010161
- Year Built
- 1967
- Reconstructed
- 1982
- Length
- 66.6 m (218.5 ft)
- Max Span
- 20.6 m
- Width
- 51.9 m (170.3 ft)
- Lanes
- 12
- Daily Traffic
- 183,900
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $881,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.