PR 18 over KALAF STREET
NORTH PLAZA LAS AMERICAS · County 127, Puerto Rico · Built 1972 · 9 Lanes · 183,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.426083, -66.072906
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 54 years old.
Nearby Bridges
RAMP CHAR TO SJU over CALLE KALAF
Built 2006
RAMP PR18 TO PR22 over PR 18
Built 1975
PR 18 over LOS MUERTOS CREEK
Built 1975
PR 22 PR 18 .1 KM over LOS MUERTOS CREEK
Built 1975
RAMP PR18 0.02 KM over PR 18 NB PR 22 WB KM 2
Built 2007
RAMP PR 22 - PR 18 over LOS MUERTOS CREEK
Built 1975
PR 18 0.65 KM over CHARDON STREET
Built 1972
PR 22 over PR 18
Built 1975
Local Road over Chardon Avenue
Built 2006
KALAF STREET over PR 22
Built 1999
Bridge Details
- Structure #
- 012991
- Year Built
- 1972
- Reconstructed
- 1983
- Length
- 47.5 m (155.8 ft)
- Max Span
- 18.1 m
- Width
- 54.5 m (178.8 ft)
- Lanes
- 9
- Daily Traffic
- 183,900
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $660,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.