PR 25 2.7 KM over PR 1 3.0 KM
EAST END OF OLD SAN JUAN · County 127, Puerto Rico · Built 1958 · 3 Lanes · 28,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.457433, -66.086481
This bridge is in worse condition than 25.9% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 68 years old.
Nearby Bridges
PR 26 0.05 KM over PR 1 3.8 KM
Built 1958
PR 26 0.1 KM over PR 25 3.5 KM
Built 1958
PR-25 over SAN ANTONIO CHANNEL
Built 2007
PR-1 over SAN ANTONIO CHANNEL
Built 2003
PR 35 3.8 KM over PR 1 3.5 KM
Built 1991
PR 1 5.0 KM over PR 39 0.01 KM
Built 1954
ASHFORD AVE. over CONDADO LAGOON
Built 2012
PR 26 over ROBERTO H TODD AVENUE
Built 1960
RAMP PR 2 TO PR 1 over PR 2
Built 1966
PR 1 over PR 2
Built 1971
Bridge Details
- Structure #
- 007491
- Year Built
- 1958
- Length
- 9.7 m (31.8 ft)
- Max Span
- 9.7 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 3
- Daily Traffic
- 28,800
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $194,000
- Total Project Cost
- $333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.