PR 904 0.50 KM over LIMONES RIVER
3 KM NORTHWEST OF YABUCOA · County 151, Puerto Rico · Built 1953 · 2 Lanes · 600 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.074606, -65.894572
This bridge is in worse condition than 45.2% of bridges in County 151. The average bridge in Puerto Rico is 0 years old; this one is 73 years old.
Nearby Bridges
PR 920 8.1 KM over LIMONES RIVER
Built 1972
PR 902 11.5 KM over LIMONES RIVER
Built 1962
PR 920 7.8 KM over WATERWAY
Built 1973
PR 920 7.8 KM over WATERWAY
Built 1973
PR 182 3.8 KM over GUAYANES RIVER
Built 2003
PR 905 0.5 KM over LOS SUSPIROS DITCH
Built 1991
PR 905 over DITCH
Built 1991
PR 182 4.6 KM over ROSA SANCHEZ CHANNEL
Built 1997
OFF PR 182 3.5 KM over ROSA SANCHEZ CHANNEL
Built 1992
PR 3 95.7 KM over GUAYANES RIVER
Built 1918
Bridge Details
- Structure #
- 006661
- Year Built
- 1953
- Length
- 50.9 m (167 ft)
- Max Span
- 11.9 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $895,000
- Total Project Cost
- $1,074,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.