PR 3 95.7 KM over GUAYANES RIVER
1 KM NORTH OF YABUCOA · County 151, Puerto Rico · Built 1918 · 2 Lanes · 11,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.059864, -65.875389
This bridge is in worse condition than 45.2% of bridges in County 151. The average bridge in Puerto Rico is 0 years old; this one is 108 years old.
Nearby Bridges
PR 9910 0.9 KM over SANTIAGO CHANNEL
Built 1919
PR 182 0.9 KM over SANTIAGO CHANNEL
Built 1946
PR 182 1.7 KM over AGUAS LARGAS CREEK
Built 1946
PR 3 over SANTIAGO CHANNEL
Built 1972
PR 905 0.5 KM over LOS SUSPIROS DITCH
Built 1991
PR 905 over DITCH
Built 1991
OFFPR 900 KM .65 over LA YUCA CREEK
Built 2012
OFF PR 900 AT K0.7 over LA YUCA CREEK
Built 2012
6TH STREET KM 10.1 over CREEK
Built 1960
PR 3 over UNNAMED CREEK
Built 1959
Bridge Details
- Structure #
- 001331
- Year Built
- 1918
- Reconstructed
- 1959
- Length
- 29.8 m (97.8 ft)
- Max Span
- 10 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 11,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $509,000
- Total Project Cost
- $611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.