PR 824 over CRUZ CREEK

4 KM SOUTH OF TOA ALTA · County 135, Puerto Rico · Built 1942 · 2 Lanes · 6,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
005471
Year Built
1942
Length
6.1 m (20 ft)
Max Span
6.1 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
6,500
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$71,000
Total Project Cost
$78,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.