PR 861 5.0 KM over BUCARABONES RIVER
BETWEEN PR 828 AND PR 829 · County 135, Puerto Rico · Built 2004 · 2 Lanes · 21,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.372575, -66.212767
This bridge is in worse condition than 23.5% of bridges in County 135. The average bridge in Puerto Rico is 0 years old; this one is 22 years old.
Nearby Bridges
PR-861 over WATERWAY
Built 2012
PROVIDENCIA AVENUE over ESCARCHA CREEK
Built 1987
PR 819 over BUCARABONES RIVER
Built 1970
PR 827 7.0 KM over PINAS CREEK
Built 1998
PR 827 over CREEK
Built 1960
PR 840 over CERRO GORDO CREEK
Built 1986
PR 824 0.7 KM over LA PLATA RIVER
Built 1951
10 STREET over SIERRA LINDA CREEK
Built 1984
CASTIGLIONI AVENUE over DRAINAGE CHANNEL
Built 1962
13 STREET over SANTA CATALINA CREEK
Built 1984
Bridge Details
- Structure #
- 027701
- Year Built
- 2004
- Length
- 30.6 m (100.4 ft)
- Max Span
- 27.9 m
- Width
- 15 m (49.2 ft)
- Lanes
- 2
- Daily Traffic
- 21,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.