PR 109 26 KM over SONADOR RIVER

3.5 KM S W SAN SEBASTIAN · County 131, Puerto Rico · Built 1948 · 2 Lanes · 5,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
002271
Year Built
1948
Length
21.2 m (69.6 ft)
Max Span
8.1 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
5,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.