PA TPK (I-576) over SR3071 POTATO GARD RUN

FINDLAY · County 003, Pennsylvania · Built 2004 · 2 Lanes · 2,025 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000043535
Year Built
2004
Length
190.2 m (624 ft)
Max Span
71.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
2,025
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.