POTATO GARDEN RD over POTATO GARDEN RUN

NEAR SR 3089 · County 003, Pennsylvania · Built 1940 · 2 Lanes · 529 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000001833
Year Built
1940
Reconstructed
2004
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
529
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.