INTERSTATE 95 S.B. over ROOSELT.PK.NAVY YARD;I95

S.APPR.GIRARD PT.3700A07 · County 101, Pennsylvania · Built 1973 · 3 Lanes · 109,146 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000038535
Year Built
1973
Reconstructed
1979
Length
594.1 m (1949.1 ft)
Max Span
38.1 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
109,146
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$954,000
Total Project Cost
$12,880,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.