I-95DOUBLE DECKER over SCHUYLKILL RIVER RR ROAD

GIRARD POINT BRD. 3699J08 · County 101, Pennsylvania · Built 1973 · 3 Lanes · 204,962 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000038530
Year Built
1973
Reconstructed
2010
Length
1574.9 m (5167 ft)
Max Span
213.4 m
Width
36.3 m (119.1 ft)
Lanes
3
Daily Traffic
204,962
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$747,000
Total Project Cost
$10,081,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.