SR 0115 TR 115 SB over SR 0081 NB & SB
PLAINS TWP OVR I-81 NB&SB · County 079, Pennsylvania · Built 1963 · 3 Lanes · 9,822 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.251122, -75.820786
This bridge is in worse condition than 53.9% of bridges in County 079. The average bridge in Pennsylvania is 0 years old; this one is 63 years old.
Nearby Bridges
SR 0115 TR 115 NB over SR 0081 I-81 NB & SB
Built 1963
SR 0081 & SR 8015 over LAUREL RUN
Built 1963
TR 309 I-81 RAMPS over LAUREL RUN CREEK
Built 1941
SR 0115 NB TR 115 over SR 8015 RAMP SEG 770
Built 1963
SR0315 TR315 NB&SB over SR 0309 TR 309 NB & SB
Built 1991
SR 0081 I-81 NB over SR 2020 JUMPER ROAD
Built 2016
SR 0081 I-81 SB over SR 2020 JUMPER ROAD
Built 2016
SR 0315 TR 315 over MILL CREEK
Built 1930
SR 0081 I-81 over MILL CREEK
Built 1963
SR 2020 SCOTT ST over LAUREL RUN
Built 1929
Bridge Details
- Structure #
- 000000000023807
- Year Built
- 1963
- Reconstructed
- 1983
- Length
- 49.4 m (162.1 ft)
- Max Span
- 26.2 m
- Width
- 17.5 m (57.4 ft)
- Lanes
- 3
- Daily Traffic
- 9,822
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $20,000
- Total Project Cost
- $265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.